PSL Energy Services

Add to Favourites
Subsurface / Well Services Subsea / Pipeline Services Topside / Process Services

Home / Equipment / Coil Tubing / Injector Tower / Wireline Intervention Mast

 

Coiled Tubing Injector Tower / Wireline Intervention Mast

DESCRIPTION :

Coiled Tubing Injector Tower comprising:-
- DNV 2.7-1 transport frame.
- Linear traversing forklift mast (2.37 metres 7.77 ft. travel).
- +/- 9” sideshift and +/- 3 degree tilting injector fork carriage.
Removable wireline mast with :-
- 2 x 2500 Kg rated hydraulic tuggers
- Wireline sheave
- Load monitoring system.

OPERATION/SERVICE : - For use offshore in Zone 1 hazardous area.
- Design Temperature to -20oC.
- Operates off coiled tubing system auxiliary hydraulics.
DESIGN CODES : - DNV 2.7-1 May 1995 Certification Notes.
- The Use of Structural Steel in Building BS449 : Part 2 : 1969
SAFETY : - Designed and manufactured in accordance with the relevant Essential Health and Safety Requirements of the European Machinery Directive 98/37/EC.
- Work platform, fall arrestors, all surfaces fitted with anti-slip, automatic stabbing of tubing eliminating manual handling, and operator intervention.
CERTIFICATION : - EC Certificate of Conformity.
- DNV 2.7-1 May 1995.
DIMENSIONAL DATA : - 5792 (L) X 2896 (W) X 4268 (H) Transit Dimensions.
- Top of wireline mast from ground level 10.64 metres to 16.78 metres (35 ft. to 55 ft.).
- Bottom of stuffing box from ground level 1.85 metres to 7.99 metres (6 ft. to 26 ft.).

WEIGHT DATA :

- Maximum transit gross weight 20000 Kg
- Maximum operating gross weight 35000 Kg

Site Search

Search for: